August 2018 | Awarded follow on contract with TOTAL Qatar for ICSS modifications associated with the DP1 project. |
July 2018 | Awarded contract with AE Projects to work on BHP’s Olympic Dam Upgrade Project. |
July 2018 | SPIE Plexal attains Recognised System Integrator Partner status in the Rockwell Automation PartnerNetwork Program. |
July 2018 | Awarded new contract with Chevron Australia for Specialist Engineering Services as an extension to the existing contract that had been in place since 2012. |
May 2018 | Formalised agreement with Schneider Electric to become a Alliance Integration Partner with a focus on safety systems in Thailand. |
May 2018 | Implemented Office365 across all locations for connectivity and efficiency. |
March 2018 | Awarded support contracts with Honeywell and Wood for the Woodside GWA DCS Upgrade Project. |
December 2017 | Awarded process and mechanical engineering consulting contracts for Yara Pilbara Fertilisers in preparation for the 2018 shutdown. |
November 2017 | Awarded I/E construction and commissioning services contract with Roy Hill for HV modifications associated with the Port Permanent Power Project. |
August 2017 | Awarded contract with TOTAL Qatar for ICSS modifications associated with the DP4 project Thailand office. |
August 2017 | Awarded contract to provide Functional Safety Management Services to Quadrant Energy initially for Ningaloo Vision, later extended to Varanus Island. |
May 2017 | Awarded major contract with Aibel for the supply of a Safety Automated System for the Greater Enfield Development for Woodside. |
January 2017 | Awarded 3 year contract with PTTEP Australasia for Offshore Automation Support Services and EEHA Hazardous Area Services on their Montara facility including implementation of a tablet based inspection system. |
January 2017 | Awarded engineering contract to provide Owners Engineer Services to Roy Hill for their Port Permanent Power Project. |
January 2017 | Finalised interim certification with TUV for FSM certification to IEC 61511, phase 4 requirements as a SIS integrator for ’Design and Engineering’ responsibility up to SIL 3 systematic capacity. |
August 2016 | Passed Achilles Audit and received FPS certification. |
June 2016 | Opened small office in Chinchilla to support CSG regional support for QGC and other operators. |
June 2016 | Transferred existing multi-discipline Engineering Contract from ROC Oil to Triangle Energy for the Cliffhead Development. |
January 2016 | Added to TOTAL’s preferred global systems integrator list following audit by TOTAL Paris. |
November 2015 | Awarded major Automation, Instrumentation, Field Network and Electrical Services Contract with QGC for their upstream CSG fields in Queensland. |
October 2015 | Plexal Group is rebranded to SPIE Plexal at all locations |
March 2015 | Plexal Group successfully completes the E/I construction works on the Bibiyana Expansion Project in Bangladesh for Chevron with over 600,000 LTI free hours. |
May 2014 | Arvind Chetty appointed as the Business Development Director for SPIE Oil and Gas Services Australia |
March 2014 | Plexal Group awarded a 3 year Master Service Agreement to provide I/E Engineering and Construction Services to Chevron Bangladesh across all facilities |
January 2014 | Plexal Group completes development of PlexAlarm and utilises it on a number of projects for clients such as Woodside to increase the efficiency of executing Alarm Rationalisation Projects |
September 2013 | ISO 9001:2008 re-certification achieved for the Perth Office, the audit and recertification was conducted by BVQi |
August 2013 | Rob Roelofs from SPIE Controlec in the Netherlands mobilises to Bangkok to take the role of Executive Director |
August 2013 | Plexal Group awarded the E/I Construction Contract for the BYX Upgrade at the existing Bibiyana Gas Plant in Sylet NE Bangladesh, a Major Capital Project for Chevron Bangladesh |
June 2013 | Plexal Group Thailand awarded a contract for the supply of E/I Supervisors and Technicians to the BPNM Minesite in Vietnam |
February 2013 | APA approves Plexispec for use at the YPB Compressor sites: Yaraloola and Paraburdoo for the upcoming Hazardous Area Inspections |
February 2013 | Plexal Group awarded a Master Engineering Services contract with Origin in Queensland in support of the APLNG development |
January 2013 | Plexal Group acquired by SPIE Oil and Gas Services, a global company with over 4,000 employees across 40 countries |
January 2013 | Plexal Group Thailand completed the historian roll out to the whole Gulf of Thailand for Chevron using OSI-Pi infrastructure |
January 2013 | Vic Di Camillo promoted to General Manager of the Perth operation |
January 2013 | Plexal Group awarded an Engineering Support contract with Chevron Australia |
December 2012 | Plexal Group awarded a contract to supply specialist Thai and Expat Construction Personnel to the Nui Phao Mine in Vietnam for Masan Resources |
September 2012 | Plexispec approved for use at DBP (Dampier to Bunbury Pipelines) sites for all Hazardous Area Inspections |
August 2012 | Plexal Group Brisbane awarded a contract for the supply of a specialist Project Engineering resources to Santos for the GLNG development |
July 2012 | Plexal Group celebrated it’s 10th Anniversary since inception |
July 2012 | Plexal Group awarded Functional Safety and Safety System programming activities for AneaCo at on the Brockway Stage 2 DiCom Waste Treatment Project |
July 2012 | Plexal Group awarded Field Development Study for Buru Petroleum’s Ungani Field |
June 2012 | Plexal Group Thailand and Bangladesh awarded Fire and Gas and Wellhead/ Compressor Control Panel Upgrade for Chevron’s JB Gas Plant in Bangladesh |
April 2012 | Plexal Group awarded Functional Safety Assessment 3 and Alarm Review for Woodside’s NR2 facility |
March 2012 | Plexal Group awarded detailed design contract for APA’s YPB Project: Brownfields upgrade of 2 existing compressor stations in Western Australia including an upgrade to the existing ESD Panels |
January 2012 | Plexal Group Thailand and Bangladesh awarded a Service Order for the E/I EPC of two new wellsites at the Moulavi Bazaar Gas Plant in NE Bangladesh. |
November 2011 | Plexal Group awarded a FEED project for the upgrade of a HMI on Santos’s Mutineer Exeter FPSO |
October 2011 | Plexal Group awarded an Alarm Rationalisation Project for ENI on the Blacktip facility |
September 2011 | Plexal Group Queensland celebrates first anniversary. Thanks to our foundation client Bow Energy and our other clients including Origin Energy, QGC and Westside Corporation. |
September 2011 | Plexal Group Thailand awarded a project with SPRC Refinery to develop ESD procedures for the refinery |
August 2011 | Plexal Group Thailand celebrated it’s 5 year anniversary since inception. The operation has also been successfully nationalised with over 50 staff working from an expanded office in Rasa Tower in Chatuchak Bangkok |
July 2011 | Received approval from the Bangladesh BOI (Board of Investment) for a fully compliant operating entity in Bangladesh. The entity has since been used as a vehicle to facilitate the mobilisation of 100 construction personnel. |
July 2011 | Plexal Group awarded a project to complete a SIL Determination and Verification for Maersk’s Ngujima-Yin FPSO |
January 2011 | Plexal Group Thailand awarded contract to provide Electrical/ Instrument and Control System Material Supply & Installation/ Commissioning Services for Chevron Bangladesh’s Muchai Gas Compressor Station |
October 2010 | Plexal Group Thailand awarded a contract with Thai Oil to develop the Project Specification and ITB Documentation for the upgrade of a 36,000 I/O Control and Safeguarding System at their refinery in Sriracha. |
September 2010 | Plexal Group Queensland signed first contract with Bow Energy for the Multidiscipline design of the surface Coal Seam Gas facilities at Bow Energy’s Blackwater CSG Field. |
July 2010 | Plexal Group Thailand awarded an 18 month Engineering Services contract with Pearl Energy to support their Control and Safeguarding Systems in the Gulf of Thailand |
March 2010 | Plexal Group Thailand awarded a Turnkey Project for an Offshore Control and Shutdown System, including Design, Cabinet Assembly and Coding/ Configuration, the end user is Origin and the panel will be installed on the Yolla Platform in the Bass Strait |
February 2010 | Plexal Group Thailand signed a 3 year contract extension with Chevron Thailand for Control & Safeguarding, PIMS Project Delivery and Operations Support for over 200 offshore Oil and Gas facilities. |
January 2010 | Awarded project for the the Design of a Fire and Gas upgrade for the first of DBP Compressor Stations |
December 2009 | Awarded first project with PPS Partnership for the design of the Process Control and SCADA systems at a Water Corporation Waste Water Treatment Plant. |
November 2009 | Awarded Master Services Agreement for DBP. |
November 2009 | Plexal Group Thailand Awarded Systems Engineering Services associated with upgrade of the Vapour Recovery Unit at Thai Oil’s Sriracha Refinery. |
September 2009 | Awarded project with Water Corporation for the Design and Construct of a brownfields SCADA upgrade for the Cervantes Town Water Supply. |
August 2009 | Awarded Design for substructure to support a Hydraulic Workover Unit for the ROC Oil Cliffhead Alpha offshore platform. |
May 2009 | Awarded preliminary design for APA Mondarra Gas Storage Project. |
October 2008 | Successful award of a Master Services Agreement with AWE for Multidiscipline engineering services. |
August 2008 | Plexal Group (Thailand) Ltd’s Production Management / Engineering Team achieves First Oil for Salamander Energy in the Bualuang Field, offshore Thailand. |
July 2008 | Awarded Instrument, Control and Electrical Design for another greenfields gas compressor stations for APA in Western Australia. |
May 2008 | Awarded Multidiscipline FEED contract by ROC Oil China for the ongoing development of the Beibu Gulf field. |
April 2008 | Awarded Multidiscipline FEED for a brownfields compressor upgrade by Chevron Australia. |
March 2008 | Awarded Instrument, Control and Electrical Design for two greenfields gas compressor stations for APA in Western Australia and Queensland. |
March 2008 | PGT awarded a contract with PTTEP for Systems Engineering Support Services for their Nth Arthit Development in the Gulf of Thailand. |
December 2007 | PGT awarded a contract for Electrical / Instrument and Control Engineering Services with Hess Thailand for their Phu Horm Gas Plant, onshore Thailand. |
October 2007 | Ranked by BRW 4th fastest-growing start-up Company nationally for Australia. |
October 2007 | Successfully awarded the Electrical and Instrument Design for a wastewater treatment plant by Gippsland Water in Victoria. |
July 2007 | Successful placement on Defence Maintenance Management, Victoria, Australia, for provision of engineering services |
June 2007 | Awarded second China contract with ROC Oil China; the Zhao Dong expansion for all control & safeguarding systems |
June 2007 | Successful placement with Water Corporation, Western Australia, on the PCS Suppliers Panel for the provision of engineering, system development, procurement and installation/commissioning |
March 2007 | Plexal Group (Thailand) awarded Instrument, Control and Electrical Engineering Services contract with GFI International for it’s Bualuang Development |
February 2007 | PGT awarded a contract to supply a Production Management Team to GFI / Salamander for the Bualuang Field Development in the Gulf of Thailand (Wellhead Platform and FPSO). |
January 2007 | Added 4 new shareholders |
December 2006 | Plexal Group (Thailand) signed Engineering Services Contract and 24/7 Maintenance Support Contract with Chevron Thailand Exploration and Production |
November 2006 | Plexal Group (Thailand)’s office in the SCB Park Plaza Bangkok officially opened |
October 2006 | The Thai Government / Thai Board of Investment (BOI) approved the promotion of Plexal Group and subsequent registration of Plexal Group (Thailand) Ltd. |
October 2006 | Ranked 11th BRW FAST100 |
July 2006 | Commence Carbon Trading by donation to plant trees to 100% offset the greenhouse gas emissions produced directly by our business |
July 2006 | Instrument, electrical and controls engineering services master service agreement with Coogee Resources, Western Australia |
June 2006 | Shareholder approval to open first branch office – Bangkok, Thailand |
June 2006 | Dean Paton elected to Board of Directors |
May 2006 | Awarded engineering services alliance contract with Roc Oil for Cliffhead Development, WA |
February 2006 | Ranked by BRW 22nd fastest-growing start-up company nationally for Australia and 1st for W.A. |
September 2005 | Awarded instrument, electrical and controls engineering services master service agreement with Agility, Western Australia for GGT and Parmelia gas transmission pipelines (over 3000km of gas pipelines) |
January 2005 | Awarded Woodside Goodwyn A Safeguarding System Upgrade FEED later moving onto detailed design of loops, hot cutover workpacks, coding, FWT and cutover supervision – total project value AU$60M |
October 2004 | Awarded master service agreement for I&C engineering services with Chevron Thailand |
September 2004 | ISO9001:2000 Quality Management accreditation by BVQi |
July 2004 | Awarded master service agreement for I&C engineering services Arc Energy Dongara, Western Australia region |
January 2004 | Restructure with 18 additional shareholders |
January 2004 | Awarded Woodside’s NRA Drill Rig Control System Upgrade study – resulted in first full Concept to Operate contract |
July 2002 | Plexal Group formed by co-founders Steve Jones and Len Bunn |